Project Location

151 Arch St, Hamden, CT 06514, USA

Solicitation Status: Current
Project Phase: Construction
Pre Bid Meeting Date: 03/16/2016 11:00 AM
Bid Date: 03/30/2016 11:00 AM
Notice to Proceed: 04/18/2016
End Date: End Date

The project involves total renovation of the existing Arch Street Pump Station. This includes the replacement of 2 dry pit submersible pumps with 3 submersible pumps located outside the building with wet well hatch access. Ancillary improvements will include new generator and upgrades to the electrical and HVAC systems along with building improvements.
Budget: $400,000

Description

The project involves total renovation of the existing Arch Street Pump Station. This includes the replacement of 2 dry pit submersible pumps with 3 submersible pumps located outside the building with wet well hatch access. Ancillary improvements will include new generator and upgrades to the electrical and HVAC systems along with building improvements.
Project Group:
Construction
 
Town Of Project:
Hamden
 
Special Instructions:
**PLEASE NOTE**

All Plans & Specs posted in the Project Document Section are strictly for
REFERENCE ONLY.

All bidders are required to purchase the Plans & Specs as per the attached Bid Invitation.
 
Project Manager:
Tom Sgroi
 
Project Manager Address:
GNHWPCA
260 East Street
New Haven, CT 06511
 
Project Manager Email:
engineering@gnhwpca.com
 
Contract Duration
270
   

Project Documents

Bid Invitation.pdf SSF 2015-04 Arch Street Plan Pick Up Sheet.pdf visualizationaerial.dwg
SSF 2015-04 Arch Street Plans for website.pdf SSF 2015-04 Arch Street P.S. ADDENDUM 1.pdf SD523-14 Doghouse MH over Brick Sewer.dwg
SSF 2015-04 Arch Street Bid Specs for website.pdf SSF 2015-04 Arch Street P.S. ADDENDUM 2.pdf