Project Location

Ella T Grasso Blvd, New Haven, CT 06519, USA

Solicitation Status: Current
Project Phase: Bidding
Pre Bid Meeting Date: 04/04/2018 10:00 AM
Bid Date: 04/26/2018 10:00 AM
Notice to Proceed: 05/01/2018
End Date: End Date

This project consists of modifications to the existing combined sewer overflow (CSO) regulator structures CSO 003 and 004 on Ella Grasso Blvd and 006 on Whalley Avenue in addition to the installation of new regulator structures along the outfalls of CSO 003 on orange Avenue and CSO 004 off Ella Grasso Blvd and CSO 006 on Whalley Ave. A new piling support system will be included at each newly installed CSO structure location. This proposed construction as well as the modifications to the three existing CSO regulators and outfalls will include manned entry rehabilitation, open cut excavation, concrete work, precast concrete structures, sewer manholes, PVC sewer pipe, ductile iron pipe, catch basin modifications, other appurtenances and surface restoration. This project also includes traffic control, subsurface utility/structure exploration activities, large utility trench support, preparatory cleaning, temporary flow control/handling and the installation and testing of new stop log weirs.
Budget: $0

Description

This project consists of modifications to the existing combined sewer overflow (CSO) regulator structures CSO 003 and 004 on Ella Grasso Blvd and 006 on Whalley Avenue in addition to the installation of new regulator structures along the outfalls of CSO 003 on orange Avenue and CSO 004 off Ella Grasso Blvd and CSO 006 on Whalley Ave. A new piling support system will be included at each newly installed CSO structure location. This proposed construction as well as the modifications to the three existing CSO regulators and outfalls will include manned entry rehabilitation, open cut excavation, concrete work, precast concrete structures, sewer manholes, PVC sewer pipe, ductile iron pipe, catch basin modifications, other appurtenances and surface restoration. This project also includes traffic control, subsurface utility/structure exploration activities, large utility trench support, preparatory cleaning, temporary flow control/handling and the installation and testing of new stop log weirs.
Project Group:
Construction
 
Town Of Project:
New Haven
 
Special Instructions:
**PLEASE NOTE**
All plans & specs posted in the Project Document Section are strictly for REFERENCE ONLY.

All bidders are required to purchase the Plans & Specs as per the attached Bid Invitation.
 
Project Manager:
Mario Ricozzi
 
Project Manager Address:
GNHWPCA
260 East Street
New Haven, CT 06511
 
Project Manager Email:
mricozzi@gnhwpca.com
 
Contract Duration
365
   

Project Documents

CWF 2016-03 Bid Invitation FINAL.pdf CWF 2016-03 West River Improvements Plan Pick Up Sheet.pdf CWF 2016-03 - Addendum No 5_FINAL Part 1 of 2.PDF
CWF 2016-03 Plans Bid Submission Drawings Package website.pdf CWF 2016-03 - Addendum No 2 Final website.pdf CWF 2016-03 - Addendum No 5_Attachment D_Revised Plans - FINAL Part 2 of 2 RFSz.pdf
CWF 2016-03 Specifications Bid Submission Specification Package website.pdf CWF 2016-03 - Addendum No 3 FINAL website.pdf CWF 2016-03 - Addendum No 6 FINAL.pdf
CWF_2016-03_West River_Drawings_Hi-Res website.pdf CWF 2016-03 - Addendum No 4 FINAL website.pdf CWF 2016-03 - Addendum No 7 FINAL.pdf
CWF 2016-03 - Addendum No 1 Final website.pdf