Project Location

Water Street, New Haven, CT

Solicitation Status: Current
Project Phase: Bidding
Pre Bid Meeting Date: 01/17/2018 10:00 AM
Bid Date: 02/08/2018 11:00 AM
Notice to Proceed: 05/01/2018
End Date: End Date

This project generally consists of the installation of a new precast concrete overflow weir structure and 24” reinforced concrete pipe at Regulator 025, and construction of a masonry wall inside Regulator 034 for permanent closure. The project requires night construction and bridging excavations to reopen the roadways to normal traffic in the daytime. Construction duration is expected to be 180 calendar days.
Budget: $0

Description

This project generally consists of the installation of a new precast concrete overflow weir structure and 24” reinforced concrete pipe at Regulator 025, and construction of a masonry wall inside Regulator 034 for permanent closure. The project requires night construction and bridging excavations to reopen the roadways to normal traffic in the daytime. Construction duration is expected to be 180 calendar days.
Project Group:
Construction
 
Town Of Project:
New Haven
 
Special Instructions:
**PLEASE NOTE**

All plans & specs posted in the Project Document Section are strictly for REFERENCE ONLY.

All bidders are required to purchase the Plans & Specs as per the attached Bid Invitation.
 
Project Manager:
Mario Ricozzi
 
Project Manager Address:
GNHWPCA
260 East Street
New Haven, CT 06511
 
Project Manager Email:
mricozzi@gnhwpca.com
 
Contract Duration
180
   

Project Documents

CWF 2016-05 Invitation to Bid FINAL.pdf CWF 2016-05 Specifications website.pdf CWF 2016-05 Improvement to Regulators 034 & 025 Plan Pick Up Sheet.pdf
CWF 2016-05 Plans website.pdf