The Greater New Haven Water Pollution Control Authority (GNHWPCA) funds and maintains a Capital Improvement Program (CIP) to ensure that its sewer systems are reliable, safe and efficient while at the same time contributes to protect the environment. Funding for the CIP is provided through the following sources: GNHWPCA’s annual operating budget, revenue bonds, grant reimbursements and grant/loan programs provided by the Connecticut Department of Environmental Projection (DEP) along with other incidental projects required by state agencies such as the Connecticut Department of Transportation (DOT.)

In this section, you will find detailed information on major construction projects currently underway in the GNHWPCA Service Area. The information will provide project purpose and description as well as GNHWPCA contacts. (project descriptions from intranet projects page “community description” )

For detailed project related information, vendors or contractors are required to login our vendor portal

Project Location

New Haven, CT, USA

Solicitation Status: Current
Project Phase: Bidding
Pre Bid Meeting Date: 04/01/2014
Bid Date: 04/22/2014
Notice to Proceed: 11/30/-0001
End Date: End Date 365

This project consists of sanitary sewer rehabilitation in Hamden and in the Lower Farm River (Area 10)Sewershed in East Haven. Rehabilitation will include preparatory cleaning, television inspection, cured-in-place pipe lining of approximately 35,000 linear feet of sanitary sewer, installation of approximately 110 lateral connection liners, rehabilitation of approximately 225 manholes, installation of 15 watertight frames & covers, replacement of 15 manhole frames & covers, resetting to grade 25 manholes, reestablishing approximately 485 house service connections and cutting approximately 30 protruding taps. All manholes must be located and all manholes located in an easement must be properly marked using a steel post manhole identification marker.
Budget: $3,000,000

Description

This project consists of sanitary sewer rehabilitation in the State Street Sewershed in Hamden and in the Lower Farm River (Area 10) Sewershed in East Haven. Rehabilitation will include preparatory cleaning, television inspection, cured-in-place-pipe lining of approximately 35,000 linear feet of sanitary sewer, installation of approximately 110 lateral connection liners, rehabilitation of approximately 225 manholes, installation of 15 watertight frames & covers, replacement of 15 manhole frames & covers, resetting to grade 25 manholes, reestablishing approximately 485 house service connections and cutting approximately 30 protruding taps. All manholes must be located and all manholes located in an easement must be properly marked using a steel post manhole identification marker.

Project Group:
Construction
 
Town Of Project:
East Haven, Hamden
 
Special Instructions:

None

 
Project Manager:
Mario Ricozzi
 
Project Manager Address:
260 East Street
New Haven, CT 06511
203-466-5280 extension 321
 
Project Manager Email:

 
Contract Duration
365
   

Project Documents

140306 - Invitation Final.pdf CWF 2012-02 I&I State St, Hamden UNOFFICIAL BID RESULTS.pdf CWF 2012-02 Bid Tabulation April 22 2014.pdf
CWF 2012-02 Specifications FOR INFORMATION ONLY RFSz.pdf 140415 CWF 2012-02 Addendum No 1 Issued April 15 2014 RFSz.pdf CWF 2012-02 Drawings FOR INFORMATION ONLY RFSz.pdf