The Greater New Haven Water Pollution Control Authority (GNHWPCA) funds and maintains a Capital Improvement Program (CIP) to ensure that its sewer systems are reliable, safe and efficient while at the same time contributes to protect the environment. Funding for the CIP is provided through the following sources: GNHWPCA’s annual operating budget, revenue bonds, grant reimbursements and grant/loan programs provided by the Connecticut Department of Environmental Projection (DEP) along with other incidental projects required by state agencies such as the Connecticut Department of Transportation (DOT.)

In this section, you will find detailed information on major construction projects currently underway in the GNHWPCA Service Area. The information will provide project purpose and description as well as GNHWPCA contacts. (project descriptions from intranet projects page “community description” )

For detailed project related information, vendors or contractors are required to login our vendor portal

Project Location

Farview Ave, East Haven, CT 06512, USA

Solicitation Status: Current
Project Phase: Bidding
Pre Bid Meeting Date: 04/12/2017 11:00AM
Bid Date: 05/17/2017 11:00AM
Notice to Proceed: 05/22/2017
End Date: End Date

The project involves implementation of flood proofing measures at four (4) existing coastal pump stations located in East Haven, CT. They include the Farview Avenue, Cosey Beach, Meadow Street and Minor Road Pump Stations. The work includes, but is not limited to, upgrading equipment (electrical, generators and pumps) to be located in a new elevated precast structure above the 500-year flood elevation. The work is being funded, in part, through the Federal Emergency Management Agency Hazard Mitigation Program.
Budget: $0

Description

The project involves implementation of flood proofing measures at four (4) existing coastal pump stations located in East Haven, CT. They include the Farview Avenue, Cosey Beach, Meadow Street and Minor Road Pump Stations. The work includes, but is not limited to, upgrading equipment (electrical, generators and pumps) to be located in a new elevated precast structure above the 500-year flood elevation. The work is being funded, in part, through the Federal Emergency Management Agency Hazard Mitigation Program.
Project Group:
Construction
 
Town Of Project:
East Haven
 
Special Instructions:
**PLEASE NOTE**

All Plans & Specs posted in the Project Document Section are strictly for
REFERENCE ONLY.

All bidders are required to purchase the Plans & Specs as per the attached Bid Invitation.
 
Project Manager:
Isabella Schroeder
 
Project Manager Address:
260 East Street
New Haven, CT
 
Project Manager Email:
ischroeder@gnhwpca.com
engineering@gnhwpca.com
 
Contract Duration
270
   

Project Documents

SSF 2013-05 East Haven PS Bid Invitation.pdf SSF 2013-05 Addendum No 1.pdf SSF 2013-05 Addendum No 2 reduced.pdf
SSF 2013-05 East Haven Set Plans & Specs Website R.pdf SSF 2013-05 East Haven Pump Stations Plan Pick Up Sheet.pdf SSF 2013-05 Addendum No. 3.pdf
SSF 2013-05 East Haven Set Drawings Website R.pdf