The Greater New Haven Water Pollution Control Authority (GNHWPCA) funds and maintains a Capital Improvement Program (CIP) to ensure that its sewer systems are reliable, safe and efficient while at the same time contributes to protect the environment. Funding for the CIP is provided through the following sources: GNHWPCA’s annual operating budget, revenue bonds, grant reimbursements and grant/loan programs provided by the Connecticut Department of Environmental Projection (DEP) along with other incidental projects required by state agencies such as the Connecticut Department of Transportation (DOT.) In this section, you will find detailed information on major construction projects currently underway in the GNHWPCA Service Area. The information will provide project purpose and description as well as GNHWPCA contacts. (project descriptions from intranet projects page “community description” )

RFP for Process Air Compressor System for Low Level Nitrogen Removal at ESWPAF (Project No: CWF 2019-04)

Solicitation Status:
Current
Project Phase:
Bidding
Pre Bid Meeting Date:
N/A
Bid Date:
02/02/2022 10:00 am
Notice to Proceed:
02/01/2023
End Date:
04/15/2025
Budget:

Description


The selected Proposer will be named as the preselected supplier of Process Air Compressor Equipment in the project specifications for the general construction of the Process Air Compressor System for Low Level Nitrogen Removal project. The Contractor shall be responsible for the purchase of the Process Air Compressor Equipment package from the Process Air Compressor Equipment Manufacturer as described herein and in the Proposal. In return, the Proposer must agree to enter into an agreement with the General Contractor who is selected by the Greater New Haven Water Pollution Control Authority to construct the Process Air Compressor System for Low Level Nitrogen Removal, and to provide the equipment and services as established in the Proposal.

  • Project Group:
    Engineering and Consulting
  • Town Of Project:
    New Haven
  • Special Instructions:
    TO BE ELIGIBLE TO SUBMIT A PROPOSAL & OBTAIN A COPY OF THE RFP, SEND AN EMAIL REQUEST TO: engineering@gnhwpca.com
  • Project Manager:
    Mario Ricozzi
  • Project Manager Address:
    GNHWPCA 260 East Street New Haven, CT 06511
  • Project Manager Email:
    mricozzi@gnhwpca.com
  • Contract Duration:
    800 Days