The Greater New Haven Water Pollution Control Authority (GNHWPCA) funds and maintains a Capital Improvement Program (CIP) to ensure that its sewer systems are reliable, safe and efficient while at the same time contributes to protect the environment. Funding for the CIP is provided through the following sources: GNHWPCA’s annual operating budget, revenue bonds, grant reimbursements and grant/loan programs provided by the Connecticut Department of Environmental Projection (DEP) along with other incidental projects required by state agencies such as the Connecticut Department of Transportation (DOT.) In this section, you will find detailed information on major construction projects currently underway in the GNHWPCA Service Area. The information will provide project purpose and description as well as GNHWPCA contacts. (project descriptions from intranet projects page “community description” )
345 East Shore Parkway, New Haven, CT 06512

East Shore Water Pollution Abatement Facility Bar Screen Replacement (Project No: SSF – 2015-01 )

Solicitation Status:
Awarded
Project Phase:
Completed
Pre Bid Meeting Date:
06/18/2015 2:00 pm
Bid Date:
07/09/2015 10:00 am
Notice to Proceed:
08/01/2015
End Date:
03/01/2016
This project involves the demolition of existing Bar Screens and supply and installation of two (2) new Bar Screens at the East Shore Water Pollution Abatement Facility. The scope also includes replacement of slide gates and repairs to the floor grating system.
Budget: $500,000

Description


This project involves the demolition of existing Bar Screens and supply and installation of two (2) new Bar Screens at the East Shore Water Pollution Abatement Facility. The scope also includes replacement of slide gates and repairs to the floor grating system.

  • Project Group:
    Construction
  • Town Of Project:
    New Haven
  • Special Instructions:
    *PLEASE NOTE* All Plans & Specs posted in the Project Document Section are strictly for Reference Only. All Bidders are required to purchase these plans & specs as per the attached Bid Invitation.
  • Project Manager:
    Joe Megale
  • Project Manager Address:
    260 East Street, New Haven, CT
  • Project Manager Email:
    engineering@gnhwpca.com
  • Contract Duration:
    213