Construction Alerts
GNHWPCA Smoke Testing Alert
Project SSR 2022-04: Westville-Whalley Sewer Study Smoke Testing
This project consists of conducting investigative analysis in the Westville area to identify potential source of extraneous water that discharge into the sanitary sewer system. This will include blowing white smoke into the sanitary sewer lines in the street and observing/recording where the smoke leaks out. This will help identify cost effective measures that the GNHWPCA, the City, the CTDOT, and the Community can take to help mitigate and manage exisiting and climate related increases in stormwater flows into the sanitary system.
For more information, including location map and sample door notice, click the Smoke Testing Links in the box to the right.
TIMING AND COORDINATION
Testing Start: Late March 2023 Duration: Four (4) Days of Testing Schedule: Mon-Fri from 8 am to 5 pm |