The Greater New Haven Water Pollution Control Authority (GNHWPCA) funds and maintains a Capital Improvement Program (CIP) to ensure that its sewer systems are reliable, safe and efficient while at the same time contributes to protect the environment. Funding for the CIP is provided through the following sources: GNHWPCA’s annual operating budget, revenue bonds, grant reimbursements and grant/loan programs provided by the Connecticut Department of Environmental Projection (DEP) along with other incidental projects required by state agencies such as the Connecticut Department of Transportation (DOT.) In this section, you will find detailed information on major construction projects currently underway in the GNHWPCA Service Area. The information will provide project purpose and description as well as GNHWPCA contacts. (project descriptions from intranet projects page “community description” )
Mitchell Dr, New Haven, CT 06511, USA

Closing Regulators 012 & 020 (Project No: CWF – 2016-02 )

Solicitation Status:
Awarded
Project Phase:
Completed
Pre Bid Meeting Date:
01/16/2018 10:00 am
Bid Date:
02/07/2018 10:00 am
Notice to Proceed:
05/01/2018
End Date:
11/01/2018
This project consists of the following:  012 Location - Cured in place pipe (CIPP) lining of approximately 500 linear feet of 48” brick sewer from the intersection of Canner Street to Regulator 012 and 480 linear feet of 35”x52” brick sewer from Regulator 012 to Willow Street. Additionally, the project also consists of manhole rehabilitation of six (6) manholes.  020 Location - CIPP lining of approximately 2,620 linear feet of 24" reinforced concrete (RC) sewer and replacing existing RCP sewer, at a lower grade, with installing 100 linear feet of new 24” PVC sewer utilizing open cut excavation, One (1) sanitary sewer drop manhole, and surface restoration along Quinnipiac Avenue. Additionally, the project also consists of manhole rehabilitation of Eighteen (18) manholes.
Budget: $0

Description


This project consists of the following:  012 Location - Cured in place pipe (CIPP) lining of approximately 500 linear feet of 48” brick sewer from the intersection of Canner Street to Regulator 012 and 480 linear feet of 35”x52” brick sewer from Regulator 012 to Willow Street. Additionally, the project also consists of manhole rehabilitation of six (6) manholes.  020 Location - CIPP lining of approximately 2,620 linear feet of 24" reinforced concrete (RC) sewer and replacing existing RCP sewer, at a lower grade, with installing 100 linear feet of new 24” PVC sewer utilizing open cut excavation, One (1) sanitary sewer drop manhole, and surface restoration along Quinnipiac Avenue. Additionally, the project also consists of manhole rehabilitation of Eighteen (18) manholes.

  • Project Group:
    Construction
  • Town Of Project:
    New Haven
  • Special Instructions:
    **PLEASE NOTE**
    All plans & specs posted in the Project Document Section are strictly for REFERENCE ONLY. All bidders are required to purchase the Plans & Specs as per the attached Bid Invitation.
  • Project Manager:
    Mario Ricozzi
  • Project Manager Address:
    GNHWPCA
    260 East Street
    New Haven, CT 06511
  • Project Manager Email:
    mricozzi@gnhwpca.com
  • Contract Duration:
    184