Construction Projects
East Street Pump Station Upgrade for CSO Reduction (Project No: CWF 2017-01)
Solicitation Status:
Current
Current
Project Phase:
Bidding
Bidding
Pre Bid Meeting Date:
10/10/2024 10:00 am
10/10/2024 10:00 am
Bid Date:
11/21/2024 10:00 am
11/21/2024 10:00 am
Notice to Proceed:
05/01/2025
05/01/2025
End Date:
05/01/2029
05/01/2029
Budget:
Description
This project consists of capacity upgrades to the East Street Pump Station (ESPS) in support of the City of New Haven’s Long Term Control Plan. A comprehensive upgrade of both the Inlet Works and Operations Building is included in the Work. The Work in the Inlet Works shall include concrete repair and protective coating, replacement of all existing gates, mechanical bar screens with washer-compactors, replacement of screenings conveyors and separation of the grit and screenings. New grit collection equipment, conveyance system and grit washers will be installed and grit blowers will be replaced. The Work in the Operations Building shall include concrete repair and protective coating, replacement of all gates, and replacement of pumps along with all support and ancillary systems (piping, valves, VFDs, controls). New second floor additions are included at both the Inlet Works and Operations Building for electrical and control equipment. Odor Control systems will also be replaced at both locations.
- Project Group:
Construction - Town Of Project:
New Haven - Special Instructions:
***PLEASE NOTE*** All Plans & Specs posted in the Project Document Section are strictly for REFERENCE ONLY. All bidders are required to purchase the Plans & Specs as per the attached Bid Invitation. Registered bidders will be provided electronic bid documents. Hard copy bid forms will be provided upon registration.
- Project Manager:
Nick Stevens - Project Manager Address:
GNHWPCA 260 East Street New Haven, CT 06511 - Project Manager Email:
nstevens@gnhwpca.com
- Contract Duration:
1,460 Days