The Greater New Haven Water Pollution Control Authority (GNHWPCA) funds and maintains a Capital Improvement Program (CIP) to ensure that its sewer systems are reliable, safe and efficient while at the same time contributes to protect the environment. Funding for the CIP is provided through the following sources: GNHWPCA’s annual operating budget, revenue bonds, grant reimbursements and grant/loan programs provided by the Connecticut Department of Environmental Projection (DEP) along with other incidental projects required by state agencies such as the Connecticut Department of Transportation (DOT.) In this section, you will find detailed information on major construction projects currently underway in the GNHWPCA Service Area. The information will provide project purpose and description as well as GNHWPCA contacts. (project descriptions from intranet projects page “community description” )
151 Arch St, Hamden, CT 06514, USA

Arch Street Pump Station Rehabilitation (Project No: SSF – 2015-04 )

Solicitation Status:
Awarded
Project Phase:
Completed
Pre Bid Meeting Date:
03/16/2016 10:00 am
Bid Date:
03/30/2016 10:00 am
Notice to Proceed:
04/18/2016
End Date:
01/13/2017
The project involves total renovation of the existing Arch Street Pump Station. This includes the replacement of 2 dry pit submersible pumps with 3 submersible pumps located outside the building with wet well hatch access. Ancillary improvements will include new generator and upgrades to the electrical and HVAC systems along with building improvements.
Budget: $400,000

Description


The proposed project includes the cured-in-place pipe (CIPP) lining of approximately 4,400 feet of sewer mains of various sizes, including 12" sewers, 15" sewers, and 18" sewers of different pipe materials including cement, RCP, and VCP. UI will reimburse GNHWPCA for the lining of 1425 feet of sewers on Crown Street, Peck Street, and Ferry Street.

  • Project Group:
    Construction
  • Town Of Project:
    Hamden
  • Special Instructions:
    **PLEASE NOTE**
    All Plans & Specs posted in the Project Document Section are strictly for REFERENCE ONLY. All bidders are required to purchase the Plans & Specs as per the attached Bid Invitation.
  • Project Manager:
    Tom Sgroi
  • Project Manager Address:
    GNHWPCA
    260 East Street
    New Haven, CT 06511
  • Project Manager Email:
    engineering@gnhwpca.com
  • Contract Duration:
    270