Orchard St. Area Sewer Separation Project (Project No: CWF 2019-05)
Solicitation Status:
Awarded
Awarded
Project Phase:
Construction
Construction
Pre Bid Meeting Date:
06/16/2022 11:00 am
06/16/2022 11:00 am
Bid Date:
07/12/2022 10:00 am
07/12/2022 10:00 am
Notice to Proceed:
03/01/2023
03/01/2023
End Date:
01/29/2025
01/29/2025
Budget:
Description
This project generally consists of the installation of approximately 2,416 linear feet of storm piping ranging in diameter from 10 to 54 inches and 1,140 linear feet of 12-inch sanitary sewer installed by open cut method and 2,955 linear feet of cured-in-place pipe lining from 12-inches to 36-inches. The project also includes the installation of reinforced concrete storm and sanitary sewer structures, installation of infiltrating catch basins, 6-inch and 12-inch PVC lateral piping, and all miscellaneous and other work as may be necessary to successfully complete the project.
- Project Group:
Engineering and Consulting - Town Of Project:
New Haven - Special Instructions:
***PLEASE NOTE*** All Plans & Specs posted in the Project Document Section are strictly for REFERENCE ONLY. All bidders are required to purchase the Plans & Specs as per the Bid Invitation.
- Project Manager:
Mario Ricozzi - Project Manager Address:
GNHWPCA 260 East Street New Haven, CT 06511 - Project Manager Email:
mricozzi@gnhwpca.com
- Contract Duration:
1,187 Days
Project Documents:
- 220610_Invitation-Orchard-St-Separation-Final.pdf
- Orchard-Bid-Specs-Binder-Web-Protected.pdf
- Orchard-St-Plan-Bid-Set_06-03-2022-Web-Protected.pdf
- 220616-CWF-2012-04-2019-05-Pre-Bid-Meeting-Notice.pdf
- CWF-2019-05-Orchard-Street-Separation-Plan-Pick-Up-Sheet-8.pdf
- 220623-CWF-2019-05-Addendum-1-Orchard-St-Area-Sewer-Separation-June-23-2022-w-enclosures-RFSz.pdf
- 220714-CWF-2019-05-Addendum-2-Orchard-St-Area-Sewer-Separation-July-14-2022.pdf
- 220803-CWF-2019-05-Addendum-3-Orchard-St-Area-Sewer-Separation-August-3-2022-w-encl.pdf
- 220811-CWF-2019-05-Addendum-4-Orchard-St-Area-Sewer-Separation-August-11-2022-1.pdf
- 220914-CWF-2019-05-Addendum-5-Orchard-St-Area-Sewer-Separation-Combined-RFSz.pdf
- 220922-CWF-2019-05-Addendum-6-Orchard-St-Area-Sewer-Separation-Combined.pdf
- CWF-2019-05-Orchard-Street-Separation-Unofficial-Bid-Results.pdf